An artful celebration of mid-century creativity built on Ray Eames’s ethos of serious fun. The Bernice honors its hometown legend by injecting Sacramento’s industrial past with a playful, artistic spirit. Instead of typical residential design, the spaces are a tapestry of bright, easygoing environments layered with unique vintage finds & unexpected color pops that inspire.
Solid concrete & industrial metals balance against warm wood & textural stone, proving that elevated craftsmanship can feel entirely laid back. Every interior detail emphasizes joy by using an adventurous mix of hues & details to inspire curiosity & spark creative freedom.


Sandra Ramirez-Bravo Interior Design Project Management Scope:
Multi-Family Amenities & Units Interior Design
Bidding/Value Engineering
Respond to technical RFIs, addenda issuance oversite, bid package management, contract oversight, review & evaluate alternates for material specification while maintaining design concept & integrity, review & evaluate contractor proposed VE substitutions, coordinate with specification reps for cost breaks based on quantity & project B2B promotion, & coordinate with consultants as necessary
Construction Administration
Mockup/submittal/shop drawing review oversite, regular job site visits, transmittal coordination, punch list creation, beginning lessons learned review, payment application review, schedule & milestone monitoring, coordinating installation logistics, change order management & reactive VE
Branding
Direct collaboration with dedicated brand specialists & stakeholders to harmonize the physical property design with its marketing identity. Oversee the strategic integration of property branding across multi-family amenities, curate on-site visual touchpoints, leverage B2B manufacturer relationships for project promotion, & ensure a cohesive aesthetic narrative that bridges the gap between interior architecture, environmental graphics, & developer positioning to maximize asset market value
FF&E Selection
Highly detailed FF&E budgeting, curation & sourcing oversite, final specifications selected for all furniture/fixtures/equipment including any coordinating materials for sign off by client, lead time risk analysis, ongoing FF&E VE as needed & consultant coordination for final FF&E
Signage
Highly detailed curation & sourcing oversite, final specifications selected for all signage types including unit entry. including any coordinating materials for sign off by client, lead time risk analysis & consultant coordination for final signage. Mockup/submittal/shop drawing review oversite.
FF&E Procurement
Ongoing procurement team check-ins, final finish & sample confirmation oversite, financial management adjustments, expediting & logistic coordination, damage control as needed
Final Installation
Logistics coordination, on-site management coordination, white-glove trade management, on-site placement direction oversite, final styling oversite, stakeholder punch walk, punch list creation/resolution/closeout


Project Team
Developer / The Michaels Organization
Contractor / Brown Construction
Architect of Record / BDE Architecture
Interior Design / Vida Design
Landscape / Madden Sutter Landscape Architecture
MEP / Emerald City Engineers
Civil / Kier & Wright Civil Engineers & Surveyors
Structural Engineer / MHP Structural Engineers
Sacramento, CA | Mixed-Use Development
Mid-Rise | 5 Floors
New Construction | Overall over 144,000+ Gross Sq Ft
2025 Sacramento Business Journal Recipient Winner of Best Real Estate Projects of the Year Award
Multi-Family Amenities/Units Interior Design
Interior Design Project Scope by Vida
Executed the interior master plan, leasing layout & finish specifications
Type III Construction | 11,200 sq ft of interior & exterior recreational space
187 apartment homes | 1-, & 2- bedroom layouts
Pre design & programming, schematic design, space planning, design development, material selection & specification, construction documents, FF&E selection, FF&E specification/procurement, final installation & styling.




An artful celebration of mid-century creativity built on Ray Eames’s ethos of serious fun. The Bernice honors its hometown legend by injecting Sacramento’s industrial past with a playful, artistic spirit. Instead of typical residential design, the spaces are a tapestry of bright, easygoing environments layered with unique vintage finds & unexpected color pops that inspire.
Solid concrete & industrial metals balance against warm wood & textural stone, proving that elevated craftsmanship can feel entirely laid back. Every interior detail emphasizes joy by using an adventurous mix of hues & details to inspire curiosity & spark creative freedom.


Sandra Ramirez-Bravo Interior Design Project Management Scope:
Multi-Family Amenities & Units Interior Design
Bidding/Value Engineering
Respond to technical RFIs, addenda issuance oversite, bid package management, contract oversight, review & evaluate alternates for material specification while maintaining design concept & integrity, review & evaluate contractor proposed VE substitutions, coordinate with specification reps for cost breaks based on quantity & project B2B promotion, & coordinate with consultants as necessary
Construction Administration
Mockup/submittal/shop drawing review oversite, regular job site visits, transmittal coordination, punch list creation, beginning lessons learned review, payment application review, schedule & milestone monitoring, coordinating installation logistics, change order management & reactive VE
Branding
Direct collaboration with dedicated brand specialists & stakeholders to harmonize the physical property design with its marketing identity. Oversee the strategic integration of property branding across multi-family amenities, curate on-site visual touchpoints, leverage B2B manufacturer relationships for project promotion, & ensure a cohesive aesthetic narrative that bridges the gap between interior architecture, environmental graphics, & developer positioning to maximize asset market value
FF&E Selection
Highly detailed FF&E budgeting, curation & sourcing oversite, final specifications selected for all furniture/fixtures/equipment including any coordinating materials for sign off by client, lead time risk analysis, ongoing FF&E VE as needed & consultant coordination for final FF&E
Signage
Highly detailed curation & sourcing oversite, final specifications selected for all signage types including unit entry. including any coordinating materials for sign off by client, lead time risk analysis & consultant coordination for final signage. Mockup/submittal/shop drawing review oversite.
FF&E Procurement
Ongoing procurement team check-ins, final finish & sample confirmation oversite, financial management adjustments, expediting & logistic coordination, damage control as needed
Final Installation
Logistics coordination, on-site management coordination, white-glove trade management, on-site placement direction oversite, final styling oversite, stakeholder punch walk, punch list creation/resolution/closeout


Project Team
Developer / The Michaels Organization
Contractor / Brown Construction
Architect of Record / BDE Architecture
Interior Design / Vida Design
Landscape / Madden Sutter Landscape Architecture
MEP / Emerald City Engineers
Civil / Kier & Wright Civil Engineers & Surveyors
Structural Engineer / MHP Structural Engineers
Sacramento, CA | Mixed-Use Development
Mid-Rise | 5 Floors
New Construction | Overall over 144,000+ Gross Sq Ft
2025 Sacramento Business Journal Recipient Winner of Best Real Estate Projects of the Year Award
Multi-Family Amenities/Units Interior Design
Interior Design Project Scope by Vida
Executed the interior master plan, leasing layout & finish specifications
Type III Construction | 11,200 sq ft of interior & exterior recreational space
187 apartment homes | 1-, & 2- bedroom layouts
Pre design & programming, schematic design, space planning, design development, material selection & specification, construction documents, FF&E selection, FF&E specification/procurement, final installation & styling.