A refined take on the classic farmhouse, shaped by the natural landscape of Davis and the legacy of its hometown pioneer, Dr. Celeste Turner Wright. As the first female faculty member with a Ph.D. at UC Davis, Dr. Wright broke boundaries while infusing the campus with decades of theater, poetry, and relentless creative energy. Celeste honors this trailblazing spirit, elevating simple, agrarian country forms into a deeply intellectual, resort-inspired residential experience.

Sandra Ramirez-Bravo Interior Design Project Management Scope:

Multi-Family Amenities & Units Interior Design

Bidding/Value Engineering

  • Respond to technical RFIs, addenda issuance oversite, bid package management, contract oversight, review & evaluate alternates for material specification while maintaining design concept & integrity, review & evaluate contractor proposed VE substitutions, coordinate with specification reps for cost breaks based on quantity & project B2B promotion, & coordinate with consultants as necessary

Construction Administration

  • Mockup/submittal/shop drawing review oversite, regular job site visits, transmittal coordination, punch list creation, beginning lessons learned review, payment application review, schedule & milestone monitoring, coordinating installation logistics, change order management & reactive VE

Branding

  • Direct collaboration with dedicated brand specialists and stakeholders to harmonize the physical property design with its marketing identity. Oversee the strategic integration of property branding across multi-family amenities, curate on-site visual touchpoints, leverage B2B manufacturer relationships for project promotion, and ensure a cohesive aesthetic narrative that bridges the gap between interior architecture, environmental graphics, and developer positioning to maximize asset market value.

FF&E Selection

  • Highly detailed FF&E budgeting, curation & sourcing oversite, final specifications selected for all furniture/fixtures/equipment including any coordinating materials for sign off by client, lead time risk analysis, ongoing FF&E VE as needed & consultant coordination for final FF&E

Signage

  • Highly detailed curation & sourcing oversite, final specifications selected for all signage types including unit entry. including any coordinating materials for sign off by client, lead time risk analysis & consultant coordination for final signage. Mockup/submittal/shop drawing review oversite.

FF&E Procurement

  • Ongoing procurement team check-ins, final finish & sample confirmation oversite, financial management adjustments, expediting & logistic coordination, damage control as needed

Final Installation

  • Logistics coordination, on-site management coordination, white-glove trade management, on-site placement direction oversite, final styling oversite, stakeholder punch walk, punch list creation/resolution/closeout

Project Team

  • Developer / The Michaels Organization

  • Contractor / Brown Construction

  • Architect of Record / Architectural Design Collaborative

  • Interior Design / Vida Design

  • Landscape / Cunningham Engineering

  • MEP / Emerald City Engineers

  • Civil / Cunningham Engineering

  • Structural Engineer / MHP Structural Engineers

  • Davis, CA | Mixed-Use Development
    Mid-Rise | 9 Floors

  • New Construction | Overall over 226,000 Sq Ft

Interior Design Magazine Recognition: The community benefits from the elite industry standing of its design team. Vida Design consistently maintains a ranking as an Interior Design Magazine Top 100 Giant in the Residential Sector, heavily featuring The Celeste as a signature project within its Northern California design map.

Sustainability & Green Engineering Benchmarks: The physical project is structurally optimized to incorporate a high-capacity decentralized rooftop solar panel grid system engineered to meet strict Northern California renewable energy building parameters.

Multi-Family Amenities/Units Interior Design

Interior Design Project Scope by Vida

Executed the interior master plan, leasing layout & finish specifications

Quantity of (3) 3-4 Story Residential Buildings | 10,000 sq ft of interior & exterior recreational space

225 apartment homes | 1-, & 2- bedroom layouts

Pre design & programming, schematic design, space planning, design development, material selection and specification, construction documents, FF&E selection, FF&E specification/procurement, final installation & styling.

A refined take on the classic farmhouse, shaped by the natural landscape of Davis and the legacy of its hometown pioneer, Dr. Celeste Turner Wright. As the first female faculty member with a Ph.D. at UC Davis, Dr. Wright broke boundaries while infusing the campus with decades of theater, poetry, and relentless creative energy. Celeste honors this trailblazing spirit, elevating simple, agrarian country forms into a deeply intellectual, resort-inspired residential experience.

Sandra Ramirez-Bravo Interior Design Project Management Scope:

Multi-Family Amenities & Units Interior Design

Bidding/Value Engineering

  • Respond to technical RFIs, addenda issuance oversite, bid package management, contract oversight, review & evaluate alternates for material specification while maintaining design concept & integrity, review & evaluate contractor proposed VE substitutions, coordinate with specification reps for cost breaks based on quantity & project B2B promotion, & coordinate with consultants as necessary

Construction Administration

  • Mockup/submittal/shop drawing review oversite, regular job site visits, transmittal coordination, punch list creation, beginning lessons learned review, payment application review, schedule & milestone monitoring, coordinating installation logistics, change order management & reactive VE

Branding

  • Direct collaboration with dedicated brand specialists and stakeholders to harmonize the physical property design with its marketing identity. Oversee the strategic integration of property branding across multi-family amenities, curate on-site visual touchpoints, leverage B2B manufacturer relationships for project promotion, and ensure a cohesive aesthetic narrative that bridges the gap between interior architecture, environmental graphics, and developer positioning to maximize asset market value.

FF&E Selection

  • Highly detailed FF&E budgeting, curation & sourcing oversite, final specifications selected for all furniture/fixtures/equipment including any coordinating materials for sign off by client, lead time risk analysis, ongoing FF&E VE as needed & consultant coordination for final FF&E

Signage

  • Highly detailed curation & sourcing oversite, final specifications selected for all signage types including unit entry. including any coordinating materials for sign off by client, lead time risk analysis & consultant coordination for final signage. Mockup/submittal/shop drawing review oversite.

FF&E Procurement

  • Ongoing procurement team check-ins, final finish & sample confirmation oversite, financial management adjustments, expediting & logistic coordination, damage control as needed

Final Installation

  • Logistics coordination, on-site management coordination, white-glove trade management, on-site placement direction oversite, final styling oversite, stakeholder punch walk, punch list creation/resolution/closeout

Project Team

  • Developer / The Michaels Organization

  • Contractor / Brown Construction

  • Architect of Record / Architectural Design Collaborative

  • Interior Design / Vida Design

  • Landscape / Cunningham Engineering

  • MEP / Emerald City Engineers

  • Civil / Cunningham Engineering

  • Structural Engineer / MHP Structural Engineers

  • Davis, CA | Mixed-Use Development
    Mid-Rise | 9 Floors

  • New Construction | Overall over 226,000 Sq Ft

Interior Design Magazine Recognition: The community benefits from the elite industry standing of its design team. Vida Design consistently maintains a ranking as an Interior Design Magazine Top 100 Giant in the Residential Sector, heavily featuring The Celeste as a signature project within its Northern California design map.

Sustainability & Green Engineering Benchmarks: The physical project is structurally optimized to incorporate a high-capacity decentralized rooftop solar panel grid system engineered to meet strict Northern California renewable energy building parameters.

Multi-Family Amenities/Units Interior Design

Interior Design Project Scope by Vida

Executed the interior master plan, leasing layout & finish specifications

Quantity of (3) 3-4 Story Residential Buildings | 10,000 sq ft of interior & exterior recreational space

225 apartment homes | 1-, & 2- bedroom layouts

Pre design & programming, schematic design, space planning, design development, material selection and specification, construction documents, FF&E selection, FF&E specification/procurement, final installation & styling.